Connect with us

Logistics

Pharma Aero Has Recently Taken on Bollore Logistics

Published

on

Two trucks moving down the road at dawn.

“Pharma.Aero continues to expand its global network and we welcome Bollore Logistics into the membership. It allows us to further improve the air transportation and handling of pharmaceutical and vaccine shipments by creating awareness and focusing on global collaboration within the air cargo industry,” said Nathan De Valck, chairman, Pharma.Aero.

Brice Bellin, head healthcare & life science Europe; and Netka Hohlfeld, healthcare director Germany & Central Europe, Bollore Logistics, added, “Bollore Logistics is aware about the importance of supply chain collaboration and required efficiencies to ensure the global distribution of the healthcare industry. We see it as our duty to be tier-one supply chain partner as one of the world’s top 10 transport and logistics groups, with the largest integrated logistics network in Africa. It is an honour to be a part of a common approach which will improve compliance, quality, recognise and mitigate risks, and increase stakeholders visibility in this complex pharma industry, more particularly for the supply of vaccines in the health context that we are currently experiencing.”

Continue Reading

Logistics

Transnet Implements Urgent Measures to Reduce Durban Gateway Terminal Backlogs

Published

on

Cargo container ship docked at a shipping port.

Transnet is implementing a series of urgent interventions to reduce congestion at Durban Gateway Terminal (DGT), following operational challenges that have affected shipping lines, cargo owners and the wider logistics value chain.

The measures, announced in a media statement on 18 November 2026, are being coordinated with Durban Gateway Terminal and aim to increase available capacity, improve vessel evacuation and progressively reduce the backlog at the Port of Durban.

Transnet says the situation is being monitored at senior leadership level, with several interventions targeting both vessel movements and the evacuation of cargo from the terminal.

Additional Berthing Capacity and Vessel Diversions

One of the immediate measures involves making Berth 102 available at the Port of Durban to accommodate geared vessels for direct cargo discharge.

Transnet National Ports Authority (TNPA) has dedicated the berth to provide additional capacity and encourage shipping lines to divert suitable vessels away from congested operations.

The intervention also supports the diversion of vessels to the Ngqura Container Terminal (NCT), where Durban-bound containers can be discharged before being transferred by smaller geared vessels to Berth 102 and the Point Terminal.

Transnet Port Terminals (TPT) and DGT are coordinating the identification of suitable vessels for diversion to Ngqura, with the additional berth expected to strengthen this arrangement.

Pier 1 to Receive Additional Crane Capacity

Transnet is also working to increase handling capacity at Pier 1 through the return of ship-to-shore (STS) cranes from long-term refurbishment.

The final crane is scheduled for commissioning on Friday, 20 November, before being handed over to operations on Saturday, 21 November. This will bring all six cranes into operational availability at the terminal.

Additional crane availability is expected to support cargo handling and contribute to reducing the vessel backlog.

Transnet also assessed whether equipment could be transferred from other terminals to DGT. However, Cape Town Container Terminal and Cape Town Multi-Purpose Terminal are currently unable to release equipment because of their requirements during the peak deciduous fruit export season.

The company says it will continue reviewing opportunities to optimise equipment deployment across its network.

Rail Services to Help Clear Import Containers

Alongside the measures targeting vessel movements, Transnet Freight Rail (TFR) has made trains available to evacuate imported containers destined for Gauteng.

This provides another option for moving cargo away from the port and reducing pressure on landside operations.

Transnet is encouraging industry participants to make use of the available rail services to support the evacuation process.

The company is also prioritising essential cargo, including pharmaceuticals and automotive parts, before vessels berth to ensure these goods receive priority evacuation from the terminal.

Coordinating the Recovery of Port Operations

Transnet acknowledges that resolving the backlog will require continued coordination between terminal operations, TNPA, TFR, shipping lines, customers and other stakeholders.

The interventions highlight the importance of addressing congestion across multiple stages of the port operation. Additional berthing capacity and crane availability can support vessel handling, while rail services and cargo prioritisation help move containers away from the terminal.

For importers, exporters and manufacturers, the effectiveness of these measures will be important in restoring more predictable cargo movements through Durban.

Transnet says it will continue providing updates to key stakeholders as the interventions progress, with the aim of restoring operational performance as quickly and sustainably as possible.

Article adapted from a media statement issued by Transnet SOC Ltd.

Continue Reading

Logistics

India to Africa: Getting Cumin Shipments Right From Port of Loading to Warehouse

Published

on

Abhishek Yadav, founder of Gadin Exports.

By Abhishek Yadav, Gadin Exports

I have always loved cooking, and spices were the part of the kitchen I was most curious about. When I decided to start my own export business, cumin was an easy choice. It sells in high volumes, people use it every day so demand does not go away, and it is grown close to where I am in India. Today I run Gadin Exports and work as a cumin exporter in India, sourcing from the Unjha market in Gujarat.

I have shipped cumin to Ghana and I am now working to build more buyer relationships across Africa. Africa is a big opportunity for Indian spices, and most of the cumin used across the continent comes either directly from India or through traders in the UAE. Here is what I have learned so far about getting a cumin shipment right, from the time it leaves the warehouse in India to the time it reaches the buyer.

Start With the Right Grade

Most African buyers I speak to ask for Singapore 99 grade cumin seeds (I have explained the main cumin seed grades in more detail separately), machine cleaned, with moisture below 10%. Singapore 99 means the seeds are 99% pure, with up to 1% impurity. This is a practical grade for the African market because it balances quality and price well.

Higher grades like Europe 99.5 or sortex cleaned are available, but they cost more, and in my experience most African importers do not ask for them unless they are supplying a premium customer.

A wooden spoon filled with cumin seeds.

The other thing buyers ask about early is packaging. We offer 25 kg and 30 kg PP bags, and most customers prefer 25 kg. The bags are easier to handle at the port and in the warehouse, and they suit the way distributors break up the stock for smaller buyers.

How I Source and Check Quality

I go to Unjha myself. When I visit my supplier, I check the latest lot and the lab test report before I agree to anything. I do not want to rely only on what someone tells me over the phone. If the lot does not look right or the report is not clear, I do not take it.

Abhishek Yadav with a handful of raw cumin seeds.

Moisture is something I am strict about. We always keep it below 10%, and it is checked by a lab, not by guesswork. High moisture is one of the main reasons spices get damaged on the way, so this check matters more than people think.

Shipping: Port, Terms and Transit Time

We ship to Africa from Mundra port in Gujarat. Depending on the destination country, transit time is usually between 14 and 21 days.

We are open to both FOB and CIF, and it depends on what the buyer wants. Some buyers have their own freight forwarder and prefer FOB. Others want us to handle shipping and prefer CIF. Both work as long as it is agreed clearly in the contract.

Our shipping company and CHA (customs house agent) take care of the container condition and loading, so that the cargo reaches without dampness or mould. Fumigation is done by an approved agency 24 hours before the container is loaded.

My one shipment to Ghana went smoothly, with no surprises on freight or delays. I know that will not always be the case, which is why the paperwork and the checks before loading are so important.

The Documents African Buyers Need

For an African shipment, we provide:

  • Commercial invoice
  • Packing list
  • Certificate of Origin (COO)
  • Phytosanitary certificate
  • Fumigation certificate
  • Lab report
  • Bill of Lading

Every document should match. The same buyer name, the same product description and the same quantities across all of them. A small mismatch can hold a container at the destination port, and the cost of that delay always ends up with someone.

African buyers almost always ask for lab reports before they commit, and I think that is the right approach.

Payment Terms: Why I Only Work on LC

Our payment terms are very clear. We work only on Letter of Credit (LC), and we tell buyers this at the start of the conversation.

The reason is simple. Both sides are dealing with someone they have never met in person, in another country. An LC protects the buyer, because the bank releases payment only when the shipping documents are in order. It also protects me, because the payment is guaranteed by the bank once I meet the LC conditions. It removes a lot of the trust problem from a first deal.

A Warning About Fake Enquiries

Like every region, Africa has some fake enquiries. A common one I have seen is a “buyer” who asks for an advance payment to cover company registration in their home country before they can place an order. A genuine importer will never ask the supplier to pay for their registration.

Most of these are easy to spot once you have some experience, but new traders on both sides should be careful. There are pros and cons with every market. You just have to learn how to work with them.

When to Buy Indian Cumin

The best time to buy Indian cumin is March to July. The new crop arrives at Unjha around February to April, so fresh stock is available and prices are usually lower.

Close-up of a cumin plant.

Prices can move a lot. This year, cumin moved from around Rs 190 to Rs 270 per kg. For an importer, buying at the right time can make a real difference to margins.

My Advice for First-Time African Importers

If you are buying Indian cumin for the first time, here are three things I would always do:

  1. Ask for lab reports. Do not accept a lot without a recent test report.
  2. Ask for samples before you place an order. Check the grade, colour and smell yourself.
  3. Check the exporter’s history. Use export-import data sites to see whether the exporter has actually shipped before, and to whom.
Piled cumin in a wooden crate.

And one thing to avoid: never pay anyone an advance for things like registration fees or “release charges” before a proper contract and payment structure are in place.

Getting a cumin shipment right is not complicated, but it does need care at every step: the right grade, a proper lab report, clean documents, safe payment terms and good timing. If both sides get these basics right, the container will reach the warehouse in good condition and the relationship can grow from there.

Continue Reading

Logistics

Richards Bay Port Undergoes R375 Million Road Upgrade to Improve Cargo Flow

Published

on

Shipping yard with blue cargo containers being stacked.

Transnet National Ports Authority (TNPA) has commenced a R375 million road rehabilitation programme at the Port of Richards Bay, targeting key routes used by heavy vehicles to access major terminals and operational facilities.

The project, which began in October 2026, forms part of TNPA’s infrastructure renewal programme and aims to improve cargo movement, operational efficiency and the long-term reliability of the port’s road network.

According to a media statement issued by TNPA on 2 November, the programme will focus on Urania Road, Newark Road and Ventura Road. Increased heavy vehicle traffic has accelerated wear and tear on these routes, making upgrades necessary to support continued port operations.

Upgrading Key Routes at Richards Bay Port

The rehabilitation work will include pavement strengthening, road widening, concrete surfacing, drainage and stormwater improvements, as well as road safety enhancements.

These upgrades are expected to improve road capacity and condition, helping to create smoother traffic flows and faster truck turnaround times once completed.

Road infrastructure plays an important role in port efficiency, particularly at facilities handling significant volumes of bulk cargo. Poor road conditions and limited capacity can affect the movement of trucks between port entrances, terminals and operational areas.

For Richards Bay, maintaining reliable access routes is important to supporting cargo operations and accommodating future demand. The planned improvements are intended to strengthen the infrastructure that connects road transport with the port’s wider logistics operations.

Supporting Port Operations and Local Employment

Richards Bay acting Port Manager Winnie Mpanza said the investment demonstrates TNPA’s commitment to maintaining port infrastructure that supports economic trade.

She added that the rehabilitation work would improve safety and help ensure the port continues to meet the needs of port users while supporting future growth and investment.

The 18-month project is also expected to create approximately 72 employment opportunities during construction, contributing to skills development and local economic participation in surrounding communities.

Investing in South Africa’s Port Infrastructure

The Richards Bay road rehabilitation programme forms part of Transnet’s broader Reinvent for Growth (R4G) strategy, which prioritises infrastructure recovery and improved performance across the logistics value chain.

While the project focuses on three roads within the port, its wider significance lies in the role that reliable internal transport infrastructure plays in cargo handling and port operations.

As South Africa works to strengthen its logistics network, investments in port access, terminal infrastructure and supporting road networks will remain important to improving the movement of goods.

Article adapted from a media statement issued by Transnet National Ports Authority (TNPA).

Continue Reading

Trending